翻訳と辞書
Words near each other
・ Electricity sector in Honduras
・ Electricity sector in Hong Kong
・ Electricity sector in Iceland
・ Electricity sector in India
・ Electricity sector in Iraq
・ Electricity sector in Ireland
・ Electricity sector in Italy
・ Electricity sector in Japan
・ Electricity sector in Luxembourg
・ Electricity sector in Macau
・ Electricity sector in Mexico
・ Electricity sector in Mongolia
・ Electricity sector in New Zealand
・ Electricity sector in Nicaragua
・ Electricity sector in Norway
Electricity sector in Pakistan
・ Electricity sector in Paraguay
・ Electricity sector in Peru
・ Electricity sector in Russia
・ Electricity sector in Singapore
・ Electricity sector in South Africa
・ Electricity sector in Spain
・ Electricity sector in Sri Lanka
・ Electricity sector in Sweden
・ Electricity sector in Switzerland
・ Electricity sector in Taiwan
・ Electricity sector in the Dominican Republic
・ Electricity sector in the Netherlands
・ Electricity sector in the United Kingdom
・ Electricity sector in Uruguay


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Electricity sector in Pakistan : ウィキペディア英語版
Electricity sector in Pakistan

Electricity in Pakistan is generated, transmitted, distributed, and retail supplied by two vertically integrated public sector utilities: Water and Power Development Authority (WAPDA) for all of Pakistan (except Karachi), and the Karachi Electric (K-Electric) for the city of Karachi and its surrounding areas. There are around 20 independent power producers that contribute significantly in electricity generation in Pakistan.〔(Pr in Pakistan )〕
For years, the matter of balancing Pakistan's supply against the demand for electricity has remained a largely unresolved matter. Pakistan faces a significant challenge in revamping its network responsible for the supply of electricity. Pakistan's electricity producers are now seeking a parity in returns for both domestic and foreign investors which indicates it to be one of the key unresolved issues in overseeing a surge in electricity generation when the country faces growing shortages.
As of 2013 massive long-standing electricity shortages continued with long-standing failure to provide reliable service and rampant corruption being met by public protests, unauthorized connections, and refusal by consumers to pay for intermittent service. Electricity generation in Pakistan has shrunk by up to 50% in recent years due to an over-reliance on fossil fuels.〔()〕 In 2008, availability of power in Pakistan falls short of the population's needs by 15%〔(【引用サイトリンク】title=Pakistan’s Ongoing Electricity Shortage )〕 Pakistan was hit by its worst power crisis in 2007 when production fell by 6000 Megawatts and massive blackouts followed suit.〔 Load Shedding and power blackouts have become severe in Pakistan in recent years.〔(【引用サイトリンク】title=More Crises in Pakistan: Electricity, Flour, Sugar, Water, Sui Gas Crises – What is the way out? : ALL THINGS PAKISTAN )〕 The main problem with Pakistan's poor power generation is rising political instability, together with rising demands for power and lack of efficiency.〔http://www.dawn.com/wps/wcm/connect/dawn-content-library/dawn/news/pakistan/16-loadshedding-to-end-by-next-summer-us-hs-06〕 Provincial and federal agencies, who are the largest consumers, often do not pay their bills.〔(Power Politics:Pakistan's energy crisis ) The Economist, 21 May 2012〕 China, Central Asia and Iran have been offering to export electricity to Pakistan at subsidized rates but the government of Pakistan has not yet responded to the offers for unknown reasons. The country has begun diversifying its energy producing capacity by investing in wind and solar energy parks to help offset the energy shortage while larger projects such as the ''Diamer-Basha Dam'' and new nuclear plants are under construction.〔()〕
==Installed capacity==

*Electricity – total installed capacity: 22,797 MW (2014)〔()〕
*Electricity – Sources (2014)
*
*fossil fuel – 14,635 MW – 64.2% of total(oil-35.2% + gas-29%)
*
*hydro – 6,611 MW – 29% of total
*
*nuclear – 1,322 MW – 5.8% of total
*
*average demand-17,000 MW
*
*shortfall-between 4,000 MW and 5,000 MW
There are four major power producers in country: WAPDA (Water & Power Development Authority), KESC (Karachi Electric Supply Company), IPPs (Independent Power Producers) and PAEC (Pakistan Atomic Energy Commission).

The break-up of the installed capacity of each of these power producers (as of Jan-2012) is as follows:
WAPDA Hydel
* Tarbela 3578 MW
* Mangla 1000 MW
* Ghazi – Barotha 1450 MW
* Warsak 243 MW
* Chashma 184 MW
* Dargai 20 MW
* Rasul 22 MW
* Shadi-Waal 13.5 MW
* Nandi pur 14 MW
* Kurram Garhi 4 MW
* Renala 1 MW
* Chitral 1 MW
* Jagran (AK) 30 MW
* Khankhwar 72 MW
* AllaiKhwar 121 MW
* Gomal Zam Dam 17 MW
* Jabban 22 MW
* Duber Khwar Dam 130 MW
* Total Hydel 6,823 MW

WAPDA Thermal
* Gas Turbine Power Station, Shahdra 59 MW
* Steam Power Station, Faisalabad 132 MW
* Gas Turbine Power Station, Faisalabad 244 MW
* Gas Power Station, Multan 195 MW
* Thermal Power Station, Muzaffargarh 1350 MW
* Thermal Power Station, Guddu 1655 MW
* Gas Turbine Power Station, Kotri 174 MW
* Thermal Power Station, Jamshoro 850 MW
* Thermal Power Station, Larkana 150 MW
* Thermal Power Station, Quetta 35 MW
* Gas Turbine Power Station, Panjgur 39 MW
* Thermal Power Station, Pasni 17 MW
* Total Thermal 4811 MW

WAPDA’s total hydel and thermal capacity is 11,272 MW. Hydel electricity generated by WAPDA varies between two extremities, i.e., between minimum of 2,414 MW and maximum of 6,761 MW depending upon the river flow.

Karachi Electric Supply Company
* Thermal Power Station, Korangi 316 MW
* Gas Turbine Power Station, Korangi 80 MW
* Gas Turbine Power Station, SITE 100 MW
* Thermal Power Station, Bin Qasim 1260 MW

KESC total generation capacity is 1756 MW.

Independent Power Producers (IPPs)
* Hub Power Project 1292 MW
* AES Lalpir Ltd, Mahmood Kot Muzaffargar 362 MW
* AES Pak Gen, Mahmood Kot Muzaffargar 365 MW
* Altern Energy Ltd, Attock 29 MW
* Fauji Kabirwala Power Company, Khanewal 157 MW
* Gul Ahmad Energy Ltd, Korangi 136 MW
* Habibullah Coastal Power Limited 140 MW
* Japan Power Generation, Lahore 120 MW
* Kohenoor Energy Limited, Lahore 131 MW
* Liberty Power Limited, Ghotki 232 MW
* Rousch Power, Khanewal 412 MW
* Saba Power Company, Sheikhupura 114 MW
* Southern Electric Power Company Limited, Raiwind 110 MW
* Tapal Energy Limited, Karachi 126 MW
* Uch Power Limited, Dera Murad Jamali, Nasirabad 586 MW
* Attock Gen Limited, Morgah Rawalpindi 165 MW
* Atlas Power, Sheikhupura 225 MW
* Engro Energy Limited, Karachi —– MW
* Kot Addu Power Company Limited (Privatized) 1638 MW
* Saif Power Plant Qadirabad, Sahiwal 225 MW
* Sitara Energy 80 MW
* Nishat Chunian Power 200 MW
* Nishat Power Limited 200 MW
Total generation capacity of IPPs is 7070 MW.

Pakistan Atomic Energy Commission
* KANUPP 137 MW
* CHASNUPP-1 325 MW
* CHASNUPP-2 340 MW
Total electricity generated from PAEC is 802 MW.

The total power generation capacity of Pakistan is 21,143 MW and the electricity demand (as of April 2010) is 14,500 MW and PEPCO is merely generating 10,000 MW.